Friday, October 18, 2013

Partners Desk


 
 
 
We don't have the before photos, but this desk turned out so good. There was a lower broken leg brace and lots of deep scratches on the top. We have it stored in climate controlled storage for our client for now.

Refinished Copper Door

Heres some pics of a copper front door we refinished:



                                                      Before                               After




                                                                        Happy Client

Country Kitchen Update

This is an old country kitchen we renovated and  removed the laminated tops and old hardware. Then we added handmade custom cabinets where some needed it, put on new hardware and painted back the original color. Custom fit 3cm granite tops & backsplash were added and the out dated
wainscoting was replaced with 1/4'' birch plywood and cedar chair rail. Then we added new lighting to brighten it up a bit.

The photos are mixed with before/after but there's a stove wall, sink wall & Frig wall. Hope you Enjoy the Renovation:







 

Monday, September 23, 2013

Pedastal Tilting Table

This nice piece had a broken leg and the top was not attached, so we fixed those problems. Stripped and sanded, stained and clear coated. We always try to use green products that are non-toxic.



Custom Cabinetry


Our client was wanting a more of a rustic open look.
These cabinets could have easily had doors applied.

Sewing Cabinet



Refinished Wood Floors



Tuesday, July 30, 2013

New Piece

We're gonna refinish this old desk.

Custom

This is a end table before we started refinishing it.
 The results after.

Cabinet

The home owner wanted some open book shelves above the desk area in their office.

Custom Cabinet

This cabinet We made for a bathroom, the resident wanted an open look.