Monday, February 22, 2016

Custom Pullouts/Rollout Shelves


We installed 15 custom fit pullouts to existing cabinets at one of our clients homes. We had to modify 3 openings that had a center stile, we took it out to make the opening wider so the pullout could go all the across. Then we put it on the back of one of the doors so when it's closed it looks like it's still part of the cabinet. 



Wednesday, February 17, 2016

New Kitchen Cabinet Doors and Drawer Fronts

The home owner wanted us to take off plastic coated press board doors and build new wooden frame and panel paint grade doors with new 35 mm euro style hinges. We also replace the drawer fronts to match. They wanted to do the paint project themselves. 



Thursday, January 14, 2016

Added Custom Vanity


                                                           ðŸ”º  Before 🔺  
            Customers wishes: One needed to be higher to level out before granite install. 


                                                                🔺 After 🔺

Monday, January 4, 2016

Mutiple Cabinet Projects

cut down frig doors
                            
                                          WE CUT DOWN BOTH DOORS ABOVE FRIG TO ACCOMIDATE
                                                                      A TALLER FRIG
all wood custom fit trash can pullout with door attached.
                                       
                                            REPLACED A WIRE TRASHCAN PULLOUT WITH
                                                            A STRONG WOOD PULLOUT

all wood built in chest of drawers with soft close slides

BUILT AND INSTALLED A PAINT GRADE FOUR DRAWER CHEST OF DRAWERS WITH UV COATED FINISHED DRAWER BOXES AND SOFT CLOSE SLIDES

custom fit cabinet doors

ADDED TWO LARGE CUSTOM PAINT GRADE RAISED PANEL DOORS TO REPLACE EXSISTING GLASS DOORS






CONTACT US, TO SCHEDULE YOUR UPGRADING PROJECTS!!!
210-278-4347




                                                    

Monday, November 30, 2015

Oven Cabinet Remodel

        ⏫   Before.  ⏫


          ⏫.  After.  ⏫ 



Monday, July 13, 2015

Custom Built Hood





AFTER BEING PAINTED.


We took out the old vent that was a down draft model that vented below the cooktop and added a conventional one that vents upward and put a vent duct through the wall to exhaust outside.

Then built a vent box that was the customers design to house the new vent.










Study Desk

We added a study desk with drawers.

Thursday, January 29, 2015

Thursday, January 15, 2015

Study Remodel


                   ⬆️BEFORE⬆️

    ADDED FINISHEDWOOD FLOOR

PAINTED WALLS & TRIMMED FLOOR!
 


Monday, November 24, 2014

Trash Can Pullout


         We removed the Trash Compactor and added a Trash Can Pullout.




Thursday, October 23, 2014

Remodeled Powder Room

             
                                                          AFTER GUTTING OUT



AFTER TEXTURING, PAINTING, ADDING BAMBO FLOORING, SET TOLET, NEW VANITY & LIGHTING AN FAN. 

Wednesday, October 15, 2014

Soft Closing Cabinet Door Hardware


Added soft closers through out Kitchen Today!
  
   These are very cost effective!!! Only one per door Required.